To Apply for a new commercial connection, please bring along the following information to enable us to serve you in most efficient manner:
Information for existing building connections:
Additional New Building:
GEBE requires a deposit and signing of the contract before the service is connected.
The purpose of the deposit is to secure payment to GEBE for electricity consumed. GEBE reserves the right to amend the deposit amounts. GEBE will assess usage based on electrical appliances installed (or to be installed) and will charge a deposit based on the monthly estimated usage. All deposits are refundable, less any balance due for electricity and water consumed, when the related account is closed.
New non-residential properties are subject to the kVA fee. This is a one-time non-refundable charge for connection the new non-residential property to the distribution network. This amount is based on the electrical demand (kVA) mentioned on the inspection form.
Estimated kVA | Amount |
---|---|
3.2kVA | NAf. 350 |
7.7kVA | NAf. 800 |
13.3kVA | NAf. 2500 |
>13.3-53.3kVA |
NAf. 2500+ NAf. 1000/5 kVA |
The estimate will be based on the data supplied with the installation card or drawing. If after the connection has been completed, the actual maximum demand exceeds the estimate, the fee concerned can be adapted. The Connection fee entitles the owner of the property to the corresponding maximum.