Start Service for my Business
start service form

The non-residential connection is for all properties that are not being used for residential purposes, such as companies, villa rentals, non-profit organizations such as schools, churches, and other organizations. For residential houses, use the new Residential Connection.

To apply for a new non-residential connection, please bring along the following information to enable us to serve you in a most efficient manner:

I already have a meter
  • New Residential Application Form
  • Pictured I.D. / Local I.D. Card.
  • Meter number(s) or previous tenant name
  • Notarial deed (Proof of ownership of property)
  • Deposit Electricity Connection
  • Deposit Water Connection

GEBE requires a deposit and signing of the contract before the service is connected.


Download application form

A meter needs to be installed
  • New Residential Application Form
  • Pictured I.D. / Local I.D. Card.
  • Meter number(s) or previous tenant name
  • Notarial deed (Proof of ownership of property)
  • Deposit Electricity Connection
  • Deposit Water Connection
  • Inspection / Building permit from Public Works Department
  • KvA fee

GEBE requires a deposit and signing of the contract before the service is connected.

Download application form


Electricity Deposit for Residential Connection:

  • 1 Phase Meter: fls. 200.
  • 2 Phase Meter: fls. 400.
  • 3 Phase Meter: fls. 600.

Water Deposit for Residential Connections:

  • fls. 200.

The purpose of the deposit is to secure payment to GEBE for electricity and water consumed. GEBE reserves the right to amend the deposit amounts referred to below. The security deposits amount is calculated based on your expected monthly usage. The following standard security deposits may be used. All deposits are refundable, less any outstanding balance due for electricity consumed, when the related account is closed.


KvA fee:

  • 3.2 kVA fls. 160
  • 7.7 kVA fls. 385
  • 13.3 kVA fls. 2000
  • >13.3 kVA fls. 2000 + fls 2500 per block of 5 kVA

With an estimated maximum demand exceeding 13.3 kVA, Fls. 2,000.00 plus Fls. 2,500 for each block of 5 kVA above a demand of 13.3 kVA.

New non-residential properties are subject to the kVA fee. This is a one-time non-refundable charge for connecting the new non-residential property to the distribution network. This amount is based on the electrical demand (kVA)